Analytical Requirements for Total Carbon, Total Inorganic Carbon, and Total Organic Carbon Quality Control
Effective Date: 07/2008
Point of Contact: Quality Engineer for Regulatory Programs
| Quality Control Requirements | Frequency | Acceptance Criteria | Failure Action |
|---|---|---|---|
| Continuing calibration verification | Every 15 samples and at the end of the run | 85% to 115% | Rerun previous 10 samples |
| Continuing calibration Blank | Periodically, following continuing calibration verification | Evaluate for carry-over and contamination | Investigate. Correct. Reanalyze. |