Analytical Requirements for Gas Chromatography
Effective Date: 11/01
Point of Contact: Quality Engineer for Regulatory Programs
| Quality Control Requirements | Frequency | Criteria | Failure Action |
|---|---|---|---|
| Continuing calibration Verification | Following calibration and routinely during run according to method | As per method, evaluate for retention time and area response | Investigate. Correct. Reanalyze. |
| Continuing calibration Blank | Periodically, following continuing calibration blank | Evaluate for carry-over and contamination | Investigate. Correct. Reanalyze. |