Contents

Analytical Requirements for Gas Chromatography

Effective Date: 11/01
Point of Contact: Quality Engineer for Regulatory Programs

Quality Control Requirements Frequency Criteria Failure Action
Continuing calibration Verification Following calibration and routinely during run according to method As per method, evaluate for retention time and area response Investigate. Correct. Reanalyze.
Continuing calibration Blank Periodically, following continuing calibration blank Evaluate for carry-over and contamination Investigate. Correct. Reanalyze.